So we've been moving pretty slow on this part of the work just because we can I guess. But tonight Charles got the plumbing done on the sink and previously, he put the countertop on, tiled the backsplash and grouted it, hung the mirror, and basically made it functional. Its a small space and I can't get a good angle to show everything fully, so I just took what I could and posted it all. The bathtub is full of materials and trash but for now, this is how the rest looks:




This weekend is going to be busy doing OTHER stuff, like...getting the yard ready for our new family member....... if you didn't hear about that, I'll be posting a pic in a bit ;) But once the yard is ready, the next week Charles plans on tackling the shower area of the bathroom. It never was a shower, only a tub with a little tile on the walls. He plans on opening up the wall, finish out the plumbing to make it a shower, knocking the existing tile off and retiling everything else. THEN this bathroom is done! This will leave ONLY the back bathroom (Master) and a few odds and ends in the other rooms, like some molding, ceiling fans and a tiny bit of grout in the kitchen. OH and recessed lighting somewhere along the way. Not much left!!! .......on the inside. Wait until you see what awaits us outside (gag!). Oh well, one thing at a time, right?


