Ok, well, we had a good few days to work since Charles was off work, but we didn't get as much done as we'd hoped. We did get some backsplash done, I did get a lot of the painting odds and ends taken care of with only a little left over, etc. Here is what is left:
1. The back splash in the kitchen to include the whole wall behind the stove.
(70% of this still left)2. The roof in the kitchen needs to be repaired where the cabinets came down and retextured, painted.
(I retextured it, only needs a coat of paint. Ran out of paint)3. The kickboards all around the bottom of the kitchen cabinets need to be done as well as the molding along the top of the cabinets and molding along the floor in dining room, some hallway and living room.
(kickboards and molding on top of cabinets remain. Molding on floor done)4. There is still some tile that needs to be grouted.
(All tile is grouted!)5. All tile needs to be sealed.
(No tile is sealed lol)6. Kitchen counters need to be sealed.
(eh..not done)7. Living room and dining room need crown molding.
(nope)
The backsplash was laid all the counters, it just needs grout and sealer. It looks GOOD! Pics soon) We just need more of the same behind the stove...can't WAIT for this to be done. Wait till you see the tile we picked!