Check Us Out!

Photobucket

Start reading below for the latest update on us!

Search the categories to the right for specifics. It starts at the top/from the beginning of our remodeling process and is numbered to keep it easy. At the very bottom, click on specific projects by name.


Photobucket
Showing posts with label 02. Aug 08-Final Offer. Show all posts
Showing posts with label 02. Aug 08-Final Offer. Show all posts

Saturday, August 2, 2008

House #6

By house #6, I mean that this is our 6th offer on a house. We have actually gone into around 45 houses w/ our Realtor. We've also taken days to drive by houses to check out neighborhoods BEFORE calling our Realtor, so all told, we have sifted through about 120 houses. SmileyCentral.com

I know...crazy.

Ok so here is house #6. It was purchased last in the 80's and as you might see, they have done nothing since! It is SO old inside, EVERYTHING needs to be replaced..literally. All of the walls need attention, new carpet, we are tiling the kitchen, hallways, bathrooms, dining room. We are gutting the kitchen all the way, etc etc. But it is 4 bedroom and has the most potential of all the older homes we considered that needed updating as well. And it is in the Village, which is a great place to be in Lompoc, and is just so peaceful. The only down side is the age of the houses.

These pics aren't great, but you can see the detached garage on the right and a walkway to the front door in the middle. The outside of this house needs to painted as you can also see.

DSCF0349.JPGDSCF0348.JPG

DSCF0346.JPG
DSCF0345.JPG

Dining Room
DSCF0344.JPG

The Den, this will be redone to be Charlie's room
DSCF0343.JPG

Living room
DSCF0347.JPG

That's all the pics I have for now of this house. Stay tuned for the progress on the closing of the house (hopefully) and the remodel to follow.

We are setting a time limit of 6 months to get it all done and have a loose schedule hammered out. This blog will be kept up to date on our progress, so please check in often and post your comments!!